Workplace · Constellation Place (the former MGM Tower), Los Angeles, CA · 2016

Client
ICM Partners
Partners
HOK, architect and design partner
Nanode, LED pucks and drivers
Tesseract, mirrored base and winch engineering
Our role
Project lead, design-build
Today
UL field-evaluated in 2016. We repair it with like-for-like parts only, which keeps its mark valid.
3
Stories of light

01 · The idea

Three stories of light

Warm white points of light hang through three floors of a stairwell, under a mirrored base that doubles them into an infinity, seen through a window from the lobby.

ICM Partners moved its headquarters to Constellation Place (the former MGM Tower) in Century City, where a stairwell runs five stories and its top three look out to the lobby through a large window. HOK, the architects, brought us in, and in April 2016 we pitched a threaded chandelier of light that softly flows and ripples. We shaped it with HOK over many revisions, modeling it in 3D first so everyone could study the spacing of the pixels: a cube of light, asymmetric and three stories tall. It was the first of what we came to call the Light Tapestry.

From the lobby: points of warm white light hanging through the stairwell behind a tall window, a sofa and two chairs in front.
From the lobby, through the window, 08.2016.
Looking up through the strands: warm white points fading into the top of the stairwell.
The strands from below, 08.2016.
The empty stairwell, a curving white stair and glass rail running up past tall windows.
The stairwell before, 04.2016.

02 · The present

All in the motion

The client wanted warm white only, so the design had to live in the motion. We tuned slow patterns through the strands with HOK and the client until they were subtle and still caught the eye.

03 · How it's built

How it's built

Jigs, lifts and a UL inspection

We built jigs to assemble the strands and drew the base in three sections that bolt together. The lifts arrived on site in July. UL's first field inspection, on 20 July 2016, listed nine things to fix, from markings to a fire enclosure over the electronics; we fixed them all, and UL's field-evaluation mark went on in August 2016.

The mirrored base laid out on the stairwell floor, its holes marked with blue arrows, strands hanging with their weights.
The base raised on its cables in the stairwell, its electronics exposed.
A UL inspector signing paperwork beside the open base, its driver boards in rows.
The base on the floor, the first strands hung with their weights, 07.2016.1 / 3

Hung on its own power

Each pixel sits on a small triangular white circuit board with gold traces, held at intervals on a trio of fine cables that also carry its power, with weights at the foot of every strand. The pixels and their drivers were designed with Nanode. Two supplies each feed six driver boards, and each board runs three strands; DMX arrives wirelessly and is isolated before it reaches the light, so every strand can be addressed on its own.

Tesseract built the mirrored base that holds the electronics. It hangs from four Aladdin lifts with cable reels, on steel beams designed by Nabih Youssef Structural Engineers, with aircraft cables braced at forty-five degrees against earthquakes. The lifts lower it five floors for service, and making the four run as one was the hardest part of the engineering.

Four Aladdin winchesLighting winches, five floors upWinch systemEngineered by TesseractAll four togetherThe hard part: one moveIn placeLowered for serviceMirrored baseBy TesseractStrandsThree storeys tallSchematic: no dimensions, travel not on file
Four winches, one move
The underside of the mirrored base, its label plate and UL field-evaluation mark, strands of light below.
The base and its UL field-evaluation label.

04 · Credits and operation

Kept to its mark

We went back to repair it in October 2017. Under UL's terms, only like-for-like parts keep its mark valid.

Height
Three stories of a five-story stairwell
Pixel
About 3/4 in triangular board, warm white
UL
Field-evaluated on site, August 2016
Client
ICM Partners
Architect and design partner
HOK (Pam Light, principal in charge; Daniel Herriott, design principal)
Project lead, design and install
Digital Ambiance (Robb Pope, lead project manager)
LED pucks and drivers
Mark Janes, Nanode
Structural engineering
Nabih Youssef Structural Engineers
Electronics consulting
Simon Schubert, Sternlabs
Mirrored base and winch engineering
Chase Putnam, Tesseract
Winches
Aladdin Light Lift
Photography
David Lena, for HOK

Have a space like this one?