Skip to content
Work / Hospitality / Flow
Menu

Flow

Fifteen rings in a lobby and up an open courtyard, every pixel made from scratch.

Hospitality · Moxy Hotel, San Diego, CA · 2018

Client
Moxy Hotels, with Moment Factory
Partners
Moment Factory, design and content
Tesseract, ring mechanical design and fabrication management
Our role
LED pucks, electronics, power, data, control and installation
The software
Moment Factory's TouchDesigner shows run on the control system we built, the rings playing as one field of light.
Today
Handed over in January 2019, with a maintenance manual of our own for finding and swapping a puck.
1,360
Pucks
15
Rings

01 · The idea

Light that flows up and away

Rings of points of light rise from a hotel lobby up an open courtyard, so a single show moves through a volume as tall as the building. Seen from below, the light flows up and away.

At the Moxy in San Diego, Moment Factory designed a series of rings strung with points of light, hanging under the lobby skylight and up the courtyard beside it, through 2016 and 2017. In October 2017 we bid to make it real, from their technical design. The challenge was to stay true to it while building something that would last for years in an open-air atrium. So we made every point of light ourselves.

Looking up the courtyard from the lobby: rings of blue points rising through the skylight, smaller rings hanging over the bar below.
The courtyard rings from the lobby.Photo: Langoworks
The lobby rings lit violet and blue over the stairs, a crew member standing on a lift beneath them.
Color tests on the lobby rings, 09.2018.

02 · The present

Moment Factory's shows

Moment Factory programmed the shows in TouchDesigner, played across the rings as one field of light. We gave them the control system their animations needed.

03 · How it's built

How it's built

Prototypes and a crane

We designed the puck through the spring of 2018: housings modeled and prototyped, a first board in April and a second in May, and diffusion tested on the prototypes. In mid-2018 the rings were redrawn as tubes, and Tesseract managed their fabrication, with Ferguson Welding Service welding them. In September the strands were assembled, the electronics mounted and tested, and the rings trucked to San Diego. On site we installed it ourselves with a hired crane crew: the courtyard stack was rigged ring by ring and flown in as one piece.

  1. Rings, by Tesseract
  2. LED runs, by Digital Ambiance
  3. First light
Tesseract's rings; our LED runs · Render
A mobile crane lifts the courtyard stack of Flow's rings, lit green, while the install crew watches from the yard.
Finished rings laid flat on the shop floor, their pucks lit violet and white.
The courtyard rings nested into one stepped stack in the shop, held with yellow straps under a chain hoist.
Two installers on scissor lifts under the lobby skylight, fixing a ring of pucks to the ceiling.
The courtyard stack goes up by crane, 20 September 2018. Photo: Digital Ambiance1 / 4

One pixel, twelve LEDs

Each puck is one pixel: twelve RGB LEDs, six to a side, behind a faceted diffuser, on a board we designed with its own power regulation, coated to keep out the weather. Power and data share one three-wire cable, and the pucks are tied to tensioned steel cables, in crescents in the courtyard and straight lines in the lobby.

We sized the drivers ring by ring and ran the data as Art-Net to PixLite controllers that drive the pucks, over the hotel's own network, so the content could play across every ring as one volume. Clark Reder analyzed the structure for Tesseract, and the lobby cables are angled out to limit sway in an earthquake.

C112 ft 6 in acrossC116 ft 0 in acrossLobby, 4 ringsUnder the skylightTesseract's ringsOurs: the pucks, power, data, control15Rings, 11 courtyard, 4 lobby1,360Pucks, one pixel each
Rings and LED runs
The hotel lounge under the lobby rings, lit magenta beneath the skylight.
Pucks strung on black cable across a ring, white faceted diffusers, one lit blue.
A hand holding an Advatek PixLite controller board, its network port and green output terminals.
The lobby rings. Photo: Langoworks1 / 3
After Tesseract's courtyard assembly, 8 Aug 2018 (STEP)
After the wiring binder, courtyard ring 01

1 / 2

Pinch to zoom, drag to move. Esc closes.

04 · Credits and operation

Back after two months

Two months after opening we were back on site, replacing parts and updating the show's addressing. In January 2019 we handed over the closeout package, the warranty and a maintenance manual of our own, with tests to find a stuck pixel and the steps to swap a puck.

Installed
September 2018
Client
Moxy Hotels
Design and content
Moment Factory
LED pucks, electronics, power, data, control and installation
Digital Ambiance
Ring mechanical design and fabrication management
Tesseract
Welding
Ferguson Welding Service
Structural analysis
Clark Reder Engineering
Photography
Langoworks

Have a space like this one?

Send a brief · Tell us where it is and what it should do. We reply with questions, then a visit.